Sterling Heights Completes $670,000 Metro Parkway Lighting and Landscaping Project
New LED lights, native plantings, and public art frames enhance safety and community pride along the three-mile corridor.
By Jessica Ostrowski
••2 min read
AI
Generic image.
The City of Sterling Heights has completed a $670,000 infrastructure project along Metro Parkway, installing new LED lighting, landscaping, and public art displays to improve safety and community aesthetics.
Key points
$670,000 total project cost for Metro Parkway improvements
180 new LED lights installed on 90 poles between Van Dyke and Hayes
Three-mile corridor upgraded from Van Dyke Avenue to Hayes Road
The project covers approximately three miles of Metro Parkway, extending from Van Dyke Avenue east to the city limits at Hayes Road. The improvements include new median streetlighting, landscaping, and the installation of new public art display structures designed to serve as a gateway for residents, visitors, and businesses.
Mayor Pro Tem Liz Sierawski described the project as a thoughtful investment in quality of life and community pride. The new LED lighting provides more uniform, directed light to help drivers see lanes and intersections with fewer dark spots, while also reducing energy consumption and maintenance needs. City Engineer Brent Bashaw noted that the LED fixtures have a longer life and lower maintenance requirements, directly translating to savings for taxpayers.
“
"By using LED lighting along this corridor, we are using less energy, getting longer life from our fixtures with lower maintenance needs. This all directly translates to fewer taxpayer dollars being used to light up this important corridor."
The landscaping portion of the project features native plantings intended to calm traffic, clean air, reduce heat, and manage stormwater to reduce flooding potential. DTE Energy supported the installation of 180 lights on 90 poles between Van Dyke and Hayes. The city received an $180,000 Energy Optimization Rebate from DTE, bringing the total project cost to $670,000, funded from the city’s major road and public art funds.
“
"DTE Energy is proud to stand alongside the City of Sterling Heights in celebrating this project and the positive impact we can make when we work together to support the community."
The project also introduces two new public art display frames designed by Erik and Israel Nordin of Detroit Design Center. These displays provide flexible space for city programs and events, and will feature rotating original artwork from local artists when not in use for city messaging. The inaugural art insert was created by local artist and Arts Commissioner Jessi Conti.